Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Deutsch |Pусский |
| No.13693755
| No.13693755
- Product Categories
- Friendly Links
| Information Name: | Beijing factory direct CGM clay track |
| Published: | 2015-04-14 |
| Validity: | 30 |
| Specifications: | 50 kg / bag |
| Quantity: | 1000.00 |
| Price Description: | |
| Detailed Product Description: | Direct orbit around CGM clay manufacturers Tel: 18701680253 Kongqing Yao QQ: 454964868 welcome to inquire or to visit the company! Beijing, Tianjin, Shanghai, Chongqing, Hebei, Inner Mongolia 辽宁 吉林 Heilongjiang, Jiangsu and Zhejiang, Anhui, Fujian 江西 山东 Henan, Hubei and Hunan Guangdong, Guangxi and Sichuan Guizhou, Yunnan and Shaanxi Gansu, Ningxia and Shanxi, Qinghai, Xinjiang, Hong Kong Macao and Taiwan ★ Features 1, the early strength of high-strength: one day strength up to 20MPa or more. 2, the flow state: flow of up to 270-300mm, can fill all the gaps and meet the requirements of secondary grouting. 3, no shrinkage: to ensure close integration between the equipment and infrastructure. 4, the construction of low temperature: -10 ℃ temperatures allow for outdoor construction. 5, good insulation: high density structure, after curing has good permeability and insulation properties. 6, durability: This is inorganic cementing material life more than the life of the concrete foundation. After a million times fatigue test, 50 freeze-thaw cycle experiments no significant changes in intensity. 30 days immersed in the oil intensity has improved significantly. ★ Uses 1, port, dock crane rail tank filling. (Rail clips grout, floor, bolts, etc.). 2, for a variety of mechanical and electrical equipment (heavy equipment, high-precision grinding) a secondary grouting. 3, steel installation works. 4, strengthening civil. ★ technical indicators Project performance test results of vertical expansion (%) 1d 0.34 fluidity (mm) 275 flexural strength (Mpa) 1d 3.40 3d 5.80 28d 8.90 Compressive Strength (Mpa) 1d 21.60 3d 40.10 28d 70.30 Note: Recommended Reference amount: 2280 ~ 2400kg / m3 ★ construction points (a) basic processing and formwork: 1 basis chiseling concrete surface, and clean up. CGM clay track member and bonded together (eg steel plate) will rust and oil and other skin removed. 2, in the four hours before watering CGM clay track on the surface of the concrete foundation is applied to wet, do not have water when watering. 3, the baffle should support set tight to prevent leakage of plasma. (B) the filling: 1, add water: According bag (50kg) ratio of 8 ~ 9kg of water mixing with water, such as the construction does not require a large degree can be a corresponding reduction in the flow of water. 2, mixing procedure: After mixing bucket predetermined amount of water is added into blender, a part of the seat into the barrel stirred dilute slurry, then I feed into the mixing time should be controlled from start to finish in one minute about. 3, stirring blades should move slowly up and down along the periphery of the barrel to make the bottom of the barrel and the barrel wall adhesion of dry material to be mixing; mixing blades not to mention on the seat liquid slurry, in order to avoid air into the base paste material inside. 4. Stir well CGM clay track should be watered. When watering, as far as possible from the side of the injection, in order to facilitate the discharge of air between the floor and the concrete foundation. When necessary, can be used bamboo and other tools diversion. Watering must be continuous after the start, without interruption. ★ ① double handle mixer with hand drill, power ≥450W, speed ≥500r / min. ② mixing blades made of δ = 1.2mm thick steel blade φ150mm, stirring rod φ12mm round. ★ Note the use of the site is strictly prohibited incorporate any admixtures, admixture in cement. Not with other manufacturers of similar products mix, in order to ensure project quality. ★ conservation 1, with wet straw bags or cloth covering has been watering good on clay track CGM and sprinkler maintenance, 2-6 times a day. 2, the curing temperature should be above 15 ℃, curing period of 7 days. Maintenance period may be extended if the field temperature is lower. 3, winter construction insulation measures need to be taken. ★ Chaimo form removal should be watered after the completion of 24 hours after form removal continued maintenance. ★ Packaging and storage packaging specifications 50kg ± 0.5kg, the composite paper bag lined with plastic bag. Store in a dry, cool place, without the moisture stored at the storage period of six months. Need extended retest before using qualified |
Admin>>>
You are the 12360 visitor
Copyright © GuangDong ICP No. 10089450, Beijing Jiahe Tiancheng Technology Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 12360 visitor
Copyright © GuangDong ICP No. 10089450, Beijing Jiahe Tiancheng Technology Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility

